NuTech Solutions - Science for Business
Industries and Solutions
ClearVu Rig Scheduling
NuTech Solutions’ innovative software for rig scheduling enables exploration and production companies to create optimal drilling schedules that maximize production and reserves while minimizing cost. Rigs can be scheduled for the right places at the right times, ensuring that the required financial return will be achieved.

The key benefit of ClearVu Rig Scheduling is that it is able to maximize total economic value for complex drilling programs. The solution simultaneously considers various constraints, such as available rig resources, rig capabilities, prospective drilling locations, well characteristics, drilling program costs, production/revenue model, etc. to calculate the optimal drilling schedule (assignments of rigs to wells at specific times).


ClearVu Rig Scheduling helps resolve some of the oil and gas industry's most difficult challenges:
  • Predicting the right number of rigs to deliver drilling programs reliably and efficiently
  • Planning the best drilling sequence given current rig resources and drilling prospects
  • Determining the impact late rig mobilization or potential downtime will have on proposed drilling schedules
  • Calculating the economic payoff for adding another rig to a drilling program
  • Understanding the best-case and worst-case, as well as the expected production scenarios for your drilling program
This is just a sample of the potential goals that can be achieved.

Learn more about the solution from the ClearVu Rig Scheduling brochure.
More Information
Contact Information
USA:
1-877-212-8544

Contact Us
Intelligent
Business
EnginesTM
That
Optimize


NuTech Solutions(N.C.) Technology User Quotes
"Finally we have the tools and information that give us the optimal solution and thats the kind of powerful breakthrough we needed to shift behavior."

Charles Harper
Director of Pipeline and Supply Operations
Air Liquide America